Landfill profiling
- Stream profiling before pad pickup
- Acceptance criteria matched to permitted cells
- Signed landfill tickets for the ops file
24/7 Command & Dispatch
Locate Jasper, TN HubEnter well pad ZIP, E&P vertical, and monthly solids volume for a fast-track commercial rate or official proposal letter from the Jasper, TN hub—typically within 24 hours.
Exploration and production operators need drill cuttings, tank bottoms, and non-hazardous E&P solids moved under a documented waste profile. Variety Waste Solutions stages roll-offs and vacuum boxes, profiles each stream, and routes to permitted landfill cells.
Field teams from Jasper, TN coordinate pad-to-landfill logistics with manifest tracking and gate-ready documentation for state oil-and-gas inspectors.
E&P programs are staffed for RCRA-exempt and non-hazardous E&P solids, state oil-and-gas waste rules, DOT transport where applicable, and landfill acceptance criteria.
Operations managers can match roll-off, vacuum-box, and bulk solids specs to landfill acceptance before a lift is scheduled.
| Container Class | Dimensions / Capacity | Stream / Spec | Handling Guidelines |
|---|---|---|---|
| 20-Yard Open-Top | 20 yd— — ~4 ton | Drill cuttings / pad solids | Tarped load; no free liquids |
| 30-Yard Roll-Off | 30 yd— — ~6 ton | Mixed E&P solids | Profiled acceptance; liner-compatible |
| Vacuum Box | 15–25 yd— | Tank bottoms / sludges | Gasketed lid; secondary containment |
| Bulk End-Dump | 18–22 ton | Non-haz E&P solids | Scale ticket + manifest at gate |
| Dewatering Box | 20 yd— | Cuttings with moisture | Geotextile liner; moisture spec on profile |
| Staging Bin | 8–12 yd— | Workover debris | Pad-level staging before landfill run |
Proof points E&P leads use to compare vendors—built around profiling, permitted cells, and pad-to-gate logistics.
Analytical testing and landfill acceptance review before containers move.
Roll-offs or vacuum boxes placed under pad containment protocols.
DOT-compliant transit with scale tickets and profile documentation.
Signed gate copies close the chain for your operations file.
4.9 — 847 reviews on Google
Variety Waste Solutions handled our drum program turnaround without a single manifest error. Their Jasper crew was on-site within hours of our RFP approval.
Official proposal letters arrived within 24 hours with complete COI attachments. Exactly what our contracting office needed for the standing debris contract.
Roll-off swaps stay on schedule and UST work is documented for our compliance file. Responsive dispatch when a store hits capacity before pickup day.
Installation hazmat hauling with cleared coordination and DRMO-ready manifests. Their team understands base access and PWS language on day one.
Grease trap and enclosure programs run cleanly across our locations. Health inspector documentation is organized and drivers know the dock protocols.
Yes. Cuttings are profiled and routed to permitted E&P landfill cells that match moisture and solids specs.
Field teams coordinate recurring roll-off swaps and vacuum-box lifts across multiple pads from Jasper.
Produced water typically routes through saltwater injection disposal—solids stay on landfill profiling.
Submit pad ZIP and monthly solids volume; the Jasper desk typically responds within 24 hours.