Skip to main content

Search BenTransport

Onsite remediation crew and soil containers at an industrial facility, staged from Jasper, TN

SITE REMEDIATION & DECOMMISSIONING

Remediation & Onsite Facility Services

  • Soil excavation and stockpile management
  • Impoundment and pit closures
  • Industrial decontamination crews

Interactive Quote & Industry Selector

Enter site ZIP, project type, and soil or pit volume for a fast-track commercial rate or official proposal letter from the Jasper, TN hub—typically within 24 hours.

Onsite crews for contaminated ground and closing facilities

Contaminated sites, operating plants, and decommissioning projects need excavation, decontamination, and impoundment closure executed under a single field plan. BenTransport supplies HAZWOPER crews, containment, and offsite disposal coordination from Jasper, TN.

Work packages cover confirmation sampling, water management, and restoration so environmental consultants are not stitching together three subcontractors at the fence line.

Onsite remediation crew and soil containers at an industrial facility from Jasper, TN

Regulatory Permits & Technical Capabilities

Remediation programs are staffed and permitted for HAZWOPER field work, RAP execution, profiled soil and pit residuals, and contact-water handling through permitted landfills or TSDFs.

EPA Certified Subtitle C/D permitted landfill and TSDF access.
DOT Hazmat Transport Hazardous materials transport certification.
RCRA Permitted Resource Conservation and Recovery Act facility protocols.
TSCA Compliant Toxic Substances Control Act handling standards.
OSHA 40-Hr HAZWOPER Certified field personnel on every specialty lift.

Remediation equipment matrix

Consultants and plant managers can match soil boxes, vacuum boxes, frac tanks, and decon pads to RAP limits before crews mobilize.

Container Class Dimensions / Capacity Stream / Spec Handling Guidelines
20–40 Yard Soil Box 20–40 yd³ Non-haz or profiled soil Lined when wet; covered for transport
Vacuum Box 15–25 yd³ Sludges / pit bottoms Gasketed; used for impoundment cleanout
Frac Tank 18,000–21,000 gal Construction / contact water Bermed; water treated or disposed offsite
Decon Pad Package Site-built As profiled wash water Gross decon of equipment before demob
Lined Roll-Off 20–30 yd³ Wet residuals / storm debris Rapid staging for disaster recovery
Confirmation Sample Kit Per grid Soil / wipe as specified Tickets and photo logs to the engineer of record

Why Choose BenTransport

Proof points consultants and plant managers use to compare vendors—built around RAP execution, pit closures, and disaster staging.

HAZWOPER RAP crews

  • Field crews execute the approved remedial action plan
  • Daily tickets back to the engineer of record
  • In-plant zones isolated from production units

Impoundment & pit closures

  • Residuals removed and contact water managed
  • Structures prepared for backfill or demolition
  • Tank, pit, and building cleanout before property transfer

Soil boxes & water iron

  • Lined 20–40 yard boxes when soil is wet
  • Frac tanks bermed for construction and contact water
  • Profiled loads to permitted landfills or TSDFs

Disaster recovery staging

  • Rapid roll-off and vacuum-box delivery from Jasper
  • Flood, fire, and storm residuals staged the same week
  • Confirmation sampling and photo logs for closure files

Remediation field workflow

1

Work plan & profiling

Align excavation limits, waste codes, and water handling with the site consultant.

2

Containment & excavation

Set boxes, tanks, and decon pads; remove soil or residuals under supervision.

3

Offsite transport

Profiled loads move to permitted landfills or TSDFs with GPS tracking.

4

Closure documentation

Tickets, sample results, and photo logs support regulatory closure.

Frequently asked questions

Do you close impoundments and pits?

Yes. We remove residuals, manage contact water, and prepare the structure for backfill or demolition.

Can you work under a consultant's RAP?

Field crews execute the approved remedial action plan and provide daily tickets back to the engineer of record.

How is excavated soil handled?

Soil is profiled, loaded into lined boxes when wet, and hauled to a permitted landfill or treatment facility.

Do you support emergency disaster recovery?

Storm and flood residuals can be staged with rapid roll-off and vacuum-box delivery from the Jasper hub.